Coming · The physical department

Call a humanoid.
The physical department, coming soon.

The API for the physical world: describe a task in plain words, a person approves it, a robot does it, and it lands on the same ledger as everything else. Not built yet. The waitlist and the readiness assessment are real today.

An illustration of the direction. Nothing on this page is live yet.

The idea

Today Hue and the departments do digital and knowledge work. Next is a physical department, on the same harness and the same MCP door: the same approvals, the same record, the same bill. Every step below is coming.

  1. 01You

    Describe

    A task in plain words: “Palletize the line 3 output after the shift,” or “Count bay C before Friday.”

  2. 02Agent

    Plan

    Humonix breaks it into steps the robot can run, with the site map, the parts and the time window.

  3. 03Agent

    Check

    Is it allowed here, now, by this robot? Zones, hours, who is on the floor, the site’s own rules.

  4. 04You

    Approve

    A named person says yes before anything moves. No yes, no task.

  5. 05Agent

    Dispatch

    One API call to the robot or humanoid your integrator runs, whichever make it is.

  6. 06Agent

    Log and bill

    What ran, when, who approved it and what it cost, on the ledger. Billed per task.

Why now

Our own data says a sixth of the work is physical.

Research note, 2026-11-16. HQ’s Demand map read 43,934 descriptions of open job postings at 17,560 companies hiring. About 17% of the hours in those postings (weighted by companies hiring) were physical or on-site work that software agents cannot do.

Machine operators, material handlers, pickers and packers, assemblers, site inspectors: factories, warehouses, construction and inspection are hiring for them every week.

What we can do today

01

The automation readiness assessment.

For factories, warehouses and plants. We read your own job postings and SOPs and sort each task: a candidate for a cobot, an AMR, vision inspection or, later, a humanoid, and the tasks that stay with people. Then a pilot plan and an ROI model you can check line by line.

Task (from the postings and SOPs)What could fitCall
Load blanks into the CNC, unload partsCobot, machine tendingCandidate
Stack finished cartons on palletsPalletizing cellCandidate
Move totes from receiving to the lineAMRCandidate
Check labels and surface defectsVision inspectionTest first
Change over a moldStays with a personNot now
Sort out a damaged delivery with the driverStays with a personNo
Sample data: an invented 85-person molding plant. Your map comes from your postings and SOPs.

02

What you get, and who does what.

We help you choose and coordinate the integrator; we do not install robots. The integrator you pick designs, installs and commissions the cell, with your people.

The task map
Every task in your postings and SOPs: a candidate, test first, or stays with people, with the reason.
The pilot plan
One cell or one route first, what it needs on the floor, and how you would know it worked.
The ROI model
Your hours, your wages, the integrator’s quotes: a model you can change, not a promise.
The integrator shortlist
Vendor-neutral: who fits your task and region, an RFQ drafted, the bids put side by side.

03

The digital side runs today.

Automation projects run on paperwork. These are live in the Run module now.

  • Live

    Work orders

    Jobs, steps and sign-offs on one record.

    Work orders
  • Live

    Safety documents

    The compliance agent drafts SOPs, JHAs and toolbox talks for a qualified person to approve.

    Safety documents
  • Live

    Purchasing

    The RFQ agent drafts requests to 2 to 5 suppliers and levels the bids.

    Purchasing
  • Live

    Project coordination

    The project coordinator keeps the schedule, the RFIs and the follow-ups moving.

    Project coordination

Use cases

What the physical department would take on. All coming.

  • Coming

    Pick and place

    Parts from a bin to a fixture, a tray or a box.

  • Coming

    Machine tending

    Loading and unloading CNCs, presses and molders between cycles.

  • Coming

    Palletizing

    Cartons stacked to the pattern, wrapped and labelled.

  • Coming

    Quality inspection

    Cameras on the line, the doubtful parts set aside for a person.

  • Coming

    Inventory counts

    Aisles counted after hours, the gaps sent to the buyer.

  • Coming

    Site inspection

    Progress photos and checklist walks on a construction site.

  • Coming

    After-hours security rounds

    A set route, with anything unusual sent to a person.

What you can buy today

The readiness assessment is scoped with you: one plant or several, how many lines, how many SOPs. For reference, these exist today:

FDE sprint: $8,000 a week
One engineer, 40 hours, one outcome agreed before it starts, on any plan. Most assessments are scoped in sprints.
Growth audit (automated): $499
The digital side: your site, funnel and stack, with a 30-day plan. Credited to any plan within 30 days.
The physical department
Not priced. When it ships it will be billed per task; the waitlist hears first.

Join the waitlist

Tell us about the site and the tasks. We write back with what the assessment would cover, and you hear first when the physical department opens.

Rather talk first? Book a 30-minute call.

We use these details to answer your request and keep a record of it, and we look up public business information about your company. Some of our service providers are outside Québec, including in the United States. You can access, correct or ask us to delete your information at any time. Details are in our privacy policy.

Questions

Is this real today?

No. The physical department is a direction and a waitlist. What is real today is the automation readiness assessment and the digital side: work orders, safety documents, purchasing and project coordination.

Is it safe?

We make no safety claim about a robot or a cell. Safety on your floor stays with your people, your integrator and the standards that apply to your site; the assessment flags the tasks that need a risk assessment by a qualified person, and Humonix never signs one off.

What about our people and the union?

The idea is to augment: robots take the repetitive tasks, people approve every task and keep the judgement. Where a collective agreement applies, involve the union early; the task map is a good place to start that conversation.

What will it cost?

The assessment is scoped with you; an FDE sprint is $8,000 a week for reference. The physical department has no price yet; it is planned to be billed per task.

Which robots will it work with?

It is designed to be vendor-neutral: one API above whichever robot or humanoid your integrator runs. We have no robot partnerships today and name none.

Do you install robots?

No. We help you choose and coordinate the integrator; the integrator designs, installs and commissions the cell.

Start with the task map.

Your postings and SOPs, read for what a robot could take and what stays with people.